ASI

Reduced price- Astec 300tph Counterflow Portable Drum Plant

link Puerto Rico
USED
$595,000.00
ASI

REDUCED PRICE - Portable Partial 150tph Drum Plant (Drum, Baghouse, Silo Package, Control House)

link MS
USED
$117,800.00
ASI

REDUCED PRICE - 150-175tph Drum Plant (Mostly Portable)

link GA
USED
$178,800.00
ASI

(REDUCED PRICE) Portable 180tph CEI Drum Plant

link Panama
USED
$1,350,000.00
ASI

M70- Barber Green 300-350 TPH Drum Plant

link South Dakota
USED
$154,000.00
ASI

Stationary 100tph Stansteel Turbo-Mix Drum Plant

link OH
USED
$89,900.00
ASI

Portable Astec Drum, SEB and Bag House

link FL
USED
$57,500.00
ASI

REDUCED PRICE - Semi-Portable 200-225tph Bituma Stor Drum Plant

link KS
USED
$184,900.00
ASI

REDUCED PRICE - Portable 1989 Astec Double Barrel Partial Drum Plant

link MT
USED
$475,000.00
ASI

Stationary 200tph Dual Drum Counterflow Drum Plant

link East Coast
USED
$495,000.00
ASI

Stationary Gencor 200 Ultra Drum Partial Plant

link NY
USED
$548,000.00

Reduced price- Astec 300tph Counterflow Portable Drum Plant

Inventory #: DP2694

Manufactured in 1985 **(Drum re-built in 2019) New Controls in 2019** ASTEC 300 TPH portable drum mix plant with the following components: * Portable 300 TPH ASTEC counterflow drum mixer * Long Nose Eco-Star 100 MBTU/HR burner * Capable of up to 30% RAP * Portable Astec 50,000 CFM Baghouse with overhead primary chamber and ducting * Dust return system is included * Portable Astec 4 Bin System with collecting conveyor * Portable Astec Incline Weigh Conveyor with Screen Deck * Portable Astec 2 Bin Recycle System * Portable Astec Recycle Weigh Conveyor * Stationary Astec control center with Stansteel Accu Track Controls Installing New in 2019 * Stationary 300 TPH Drag Conveyor. Drag rebuilt in 2022 * Plant is setup for 480V 60Hz NOTES: Plant was purchased in 2019 There were a good amount of spare and new parts included in the purchase, including a new chain for the drag. From 2019 to 2021 the plant was assembled and prepared to run. The new (2018) Stansteel control system was also installed in 2019. Plant last run and produced asphalt in December 2023 when it was replaced by a new ADM plant. Plant was fully operational until project was completed in 2023. Trunnions and drum tires were installed new in 2023. **No AC Tanks and No Silos** **Currently down on the ground, staged for loadout.**