ASI

Astec 300tph Counterflow Portable Drum Plant

link Puerto Rico
USED
$765,000.00
ASI

Portable 2017 Lintec Ixon DMI LX 1400S (140TPH)

link Eastern Canada
USED
$675,000.00
ASI

Semi-Portable 100-120tph ADM Drum Plant

link MO
USED
$149,500.00
ASI

REDUCED PRICE - Portable 200-225tph Bituma Stor Drum Plant

link KS
USED
$232,500.00
ASI

REDUCED PRICE - Semi Portable 150 - 200tph Drum Plant

link TX
USED
$130,000.00
ASI

150-175tph Drum Plant (Mostly Portable)

link GA
USED
$215,000.00
ASI

Portable 1989 Astec Double Barrel Partial Drum Plant

link MT
USED
$625,000.00
ASI

Stationary 200tph CMI Drum Plant

link NV
USED
$200,000.00
ASI

Portable 200tph CMI Drum Plant

link MO
USED
$149,800.00
ASI

Relocatable 150-200tph Drum Plant

link MS
USED
$245,900.00
ASI

REDUCED PRICE - Portable 250-350tph CMI PVM Drum Plant

link TX
USED
$245,800.00
ASI

Stationary 80-120tph Almix Drum Plant

link AR
USED
$185,000.00
ASI

Stationary 300tph Parallel Flow Drum Plant

link KS
USED
$399,800.00
ASI

Portable 325tph CMI Partial Drum Plant

link TX
USED
$99,900.00
ASI

Portable Astec Drum, SEB and Bag House

link FL
USED
$89,500.00

Astec 300tph Counterflow Portable Drum Plant

Inventory #: DP2694

Manufactured in 1985 **(Drum re-built in 2019) New Controls in 2019** ASTEC 300 TPH portable drum mix plant with the following components: * Portable 300 TPH ASTEC counterflow drum mixer * Long Nose Eco-Star 100 MBTU/HR burner * Capable of up to 30% RAP * Portable Astec 50,000 CFM Baghouse with overhead primary chamber and ducting * Dust return system is included * Portable Astec 4 Bin System with collecting conveyor * Portable Astec Incline Weigh Conveyor with Screen Deck * Portable Astec 2 Bin Recycle System * Portable Astec Recycle Weigh Conveyor * Stationary Astec control center with blending system & controls. Stansteel Accu Track Controls Installing New in 2019 * Stationary 300 TPH Drag Conveyor. Drag rebuilt in 2022 * Plant is setup for 480V 60Hz As discussed, I spoke with Gerry Paz, and he will be your main contact for inspection and purchase, should you decide to proceed. Gerry has also addressed the questions you raised below. He is copied on this email and is expecting your call to arrange the inspection. Please feel free to reach out if you have any further questions. NOTES: Plant was purchased in 2019 There were a good amount of spare and new parts included in the purchase From 2019 to 2021 the plant was assembled and prepared to run. The new (2018) Stansteel control system was also installed in 2019 Plant last run and produced asphalt in December 2023 when it was replaced by a new ADM plant." **No AC Tanks and No Silos** **Currently down on the ground, staged for loadout.**